A power plant in South Florida requested AWC’s assistance in finding a solution to reverse the fouling on their UF elements.
AWC helps Florida municipal RO save $150,000 per year by eliminating dosing of hazardous sulfuric acid
The municipal potable water RO plant is on the west coast of Florida and has a design capacity of 20 MGD. It receives water from brackish wells supplied by the Hawthorne Aquifer. There are a total of 10 trains. Four trains have Dow Filmtec BW30-400 membranes with a (40X6)→(20X6) configuration running at 75% recovery. The
AWC Eliminates scaling Problem for Potable RO Plant in Alabama
The municipal potable water RO Plant has a capacity of 640 GPM. The plant consists of two trains, each operating at 75% recovery. The train configuration is (4X6)→(2X6) with Hydranautics ESPA-1 membranes in the first stage and ESPA-2 membranes in the second stage.